|
|
|
|
|
|
Author:
|
WP2 Partners |
|
Short Description:
|
This sixth Virtual Laboratory Integration Report presents the activities of the Virtual Laboratory and Common Testbeds work package (WP2) in the third phase of the EMANICS project. This phase started in January 2009 with an open call for the twelve-month period covering the time from January ... |
|
|
|
|
|
|
|
Author:
|
WP3 Partners |
|
Short Description:
|
In the reporting period between January and December 2009 the overall objective of work package WP3 was achieved on one hand through the organization of a number of events, including the 3rd EMANICS summer school and the 3rd AIMS conference, three Dagstuhl seminars including the Seminar on Ma... |
|
|
|
|
|
|
|
Author:
|
WP4 Partners |
|
Short Description:
|
Deliverable D4.6 is the report of activities conducted within WP4 in the nine month period starting April 2009 and ending December 2009. In that period the site has continued sowing a stable behavior and only a few incidents appeared that were solved on time. Although almost at the end of the... |
|
|
|
|
|
|
|
Author:
|
Aiko Pras |
|
Short Description:
|
This document is the final report of the activity undertaken in work-package 5 for training, standardization and technology transfer in the area of device, network and service management. The document is an updated version of the interim report D5.3, and covers the full first 18 months of the... |
|
|
|
|
|
|
|
Author:
|
WP5 Partners |
|
Short Description:
|
This document is the final report of the activity undertaken in work-package 5 for training, standardization and technology transfer in the area of device, network and service management. The document covers the last full 12 months (36-48) of the EMANICS project. For the other months, please ... |
|
|
|
|
|
|
|
Author:
|
WP6 Partners |
|
Short Description:
|
This deliverable presents the activity undertaken and results obtained within work-package 6 of the EMANICS network of excellence during the year 2009. The open call made for both packaging and development activities is presented and analyzed and for each of the 5 development activities as we... |
|
|
|
|
|
|
|
Author:
|
WP7 Partners |
|
Short Description:
|
Scalability is one of the major issues in network management. Many management solutions that are available for small networks cannot be easily applied to networks consisting of hundreds or thousands of communication entities. The objective of work package 7 is the collaborative research betwe... |
|
|
|
|
|
|
|
Author:
|
M. Charalambides, J. Rubio, G. S.Machado,H. Reiser, T.Schaaf, J.Serrat, B.Stiller, M.Waldburger |
|
Short Description:
|
The document at hand is the final deliverable in a row of altogether five deliverables within the frame of EMANICS WP8, all of which concerned with various stages in an overall effort to develop a comprehensive model for economic management mechanisms. D8.5 carries on the highly successful tradit... |
|
|
|
|
|
|
|
Author:
|
WP9 Partners |
|
Short Description:
|
Work Package 9 (Autonomic Management) of the EMANICS project aims at researching the self-* properties of autonomic systems and proposing solutions to the many challenges surrounding autonomic management. Through research integration and collaboration among WP9 partners, the following three tasks... |
|
|
|
|
|
|
|
Author:
|
Bartosz Gajda and Wiktor Procyk |
|
Short Description:
|
This document presents the usage statistics of both the public and the restricted EMANICS sites for the period 1st April 2009 to 30th March 2010. In both cases we present the activity of the site reflected by the number of visitors, the number of hits and pages visited and the traffic generated |
|